Task dashboard
Monitor the selected set of tasks and participation by people and agents in Zild Flow.
Monitor the selected set of tasks and participation by people and agents in Zild Flow.
When to use
Use the dashboard to compare volume, task status and recorded participation by people and agents. To investigate an engineering, delivery or receipt issue, first select the relevant flow and department.
Define the task population
- Select a department and flow, or keep all.
- Check the task creation range: the screen starts with the last 30 days.
- If needed, set a completion range and status. Filters combine; completion filtering excludes tasks without a matching completion date.
- Choose day, week or month grouping and use Refresh.
The department filter uses the department of the task’s associated flow, not the personal department of whoever performed an event. When combining department and flow, both must match. To analyze older tasks completed now, expand or clear the creation filter. Keeping both ranges narrow can exclude completed work you intended to assess.
What the numbers represent
- Total flows: distinct flows with tasks in the filtered population, not every flow configured for the company.
- Total and completed tasks: filtered task count and, among them, tasks currently marked completed.
- Human and AI execution: distinct tasks with completion, stage-change or agent-execution events identifying the respective participant.
- User or agent lists: distinct tasks per participant. A task with multiple participants can appear in more than one row.
The same task can count once for people and once for AI. Adding these participation totals does not calculate unique tasks, and the chart proportion is neither a full-automation rate nor a measure of hours saved.
Task dates and execution dates
The timeline groups executions of the filtered tasks by event date in UTC. Weeks start on Monday. Repeated executions of the same task and participant type count once within each period; the same task can appear in different periods.
Creation and completion filters select tasks rather than directly restricting event dates. An execution can therefore appear outside the selected creation range. Date controls use the interface local calendar; consider this difference when checking records near midnight.
Reading example, not real results
Consider three synthetic tasks: A had human and AI execution; B only AI; C has no recorded execution event. The dashboard may show three tasks, one with human participation and two with AI participation. Participation totals add up to three, but only two distinct tasks have recorded execution. Do not conclude that all were automated.
In an operational review, check IDs in history and record the filter set. To evaluate ROI, combine these records with measured time, quality, rework and costs; the dashboard alone does not calculate financial benefit.
Refresh and investigation
Use Refresh after changing filters. If the query fails, resolve the error and retry before treating displayed numbers as current. Missing events do not prove that no work happened outside the platform.